综合项目交付
块链
争议解决
过程(计算)
过程管理
计算机科学
概念模型
项目管理
建筑信息建模
知识管理
概念框架
关系(数据库)
风险分析(工程)
计算机安全
业务
运营管理
系统工程
工程类
法学
数据挖掘
哲学
认识论
数据库
政治学
操作系统
调度(生产过程)
作者
Amir Faraji,Shima Homayoon Arya,Elnaz Ghasemi,Maria Rashidi,Srinath Perera,Vivian W.Y. Tam,Payam Rahnamayiezekavat
出处
期刊:Construction Innovation: Information, Process, Management
[Emerald Publishing Limited]
日期:2023-11-28
卷期号:24 (1): 384-406
被引量:1
标识
DOI:10.1108/ci-01-2023-0008
摘要
Purpose In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated project delivery (IPD) practices including early involvement of stakeholders and multiparty contracts which its combination with advanced technologies such as blockchain can lead to better dispute management and improve the whole construction process. Design/methodology/approach Based on literature review, the alternative dispute resolution (ADR) for IPD contacts were identified, and three formats of IPD contracts were selected, and the dispute resolution process of them has been analyzed. Then, based on blockchain review, a conceptual blockchain-based dispute management (BDM) model was generated for ADR in IPD. Model validation was done by an interview. Experts were asked to compare the BDM model with the traditional system regarding the ADR duration. Findings Analyses of the collected data from the experts demonstrated that the BDM model has better function in terms of time and cost for ADR process when the project is facing serious and considerable number of disputes. The relation between blockchain technology (BCT) and building information modeling (BIM) has been examined through a framework, and the ability of the proposed model for administrating dispute resolution process has been verified using four different scenarios of construction claims that show the system can run successfully. Originality The current study proposes a truthful model, reliable framework to address the problem of project dispute management in IPD contracts. The system combines the ability to being unchangeable and the reliability characteristics of BCT with informative and automation aspects of BIM together to improve dispute resolution issue in the IPD system.
科研通智能强力驱动
Strongly Powered by AbleSci AI