跨度(工程)
桥(图论)
流离失所(心理学)
结构工程
垂直位移
断层(地质)
地质学
工程类
岩土工程
地震学
心理学
医学
内科学
心理治疗师
作者
Takeshi Yamaguchi,Hiroki Aoi,Daisuke Wakabayashi
出处
期刊:IABSE Congress, Christchurch 2021: Resilient technologies for sustainable infrastructure
日期:2021-01-01
标识
DOI:10.2749/christchurch.2021.0285
摘要
<p>The Nakatsugawa Bridge is constructed over a valley with both ends linked to a tunnel. It was confirmed that there is a fault in the valley. This fault is likely to cause a relatively large vertical displacement, and fault fracture zones are distributed over a wide area. Considering these topographical and geological conditions, we planned a triple-span PC extradosed bridge which will prevent collapse in the event of a fault displacement, averting irreparable damages. Consequently, the side span is extremely short in comparison with the central span, because of space restrictions affecting arrangement of pylons and piers. This presented a challenge in that a significant imbalance between the spans might lead to a negative reaction at the girder end. This paper discusses a series of reviews made for bridge planning and design, and reports that the balance between the spans was improved successfully by using light weight butterfly webs exclusively for the central span.</p>
科研通智能强力驱动
Strongly Powered by AbleSci AI