材料科学
热的
机械
边值问题
温度测量
入口
热交换器
岩土工程
热力学
机械工程
工程类
数学
物理
数学分析
作者
Shuaijun Hu,Gangqiang Kong,Hossam Abuel-Naga,Qing Yang
出处
期刊:Journal of Geotechnical and Geoenvironmental Engineering
[American Society of Civil Engineers]
日期:2024-03-01
卷期号:150 (3)
被引量:7
标识
DOI:10.1061/jggefk.gteng-12066
摘要
This study conducted field tests to investigate the thermomechanical response of an energy wall under practical intermittent and experimental monotone operation modes. Sensors and thermometers were utilized to measure inlet/outlet water temperature, air temperature, wall temperature, and strain. The heat-exchange performance and three-dimensional thermomechanical behavior of the energy wall were closely monitored and analyzed. The test results revealed that the intermittent heating operation demonstrated superior heat-exchange performance compared to the monotone heating operation, resulting in a reduced magnitude of wall temperature change. Moreover, the study highlighted the influence of physical and thermal boundary conditions on thermally induced stress within the wall. The response of the wall to thermal loading was found to be influenced by various factors, including location, temperature change, and the heating history, particularly in the intermittent operation.
科研通智能强力驱动
Strongly Powered by AbleSci AI