Kishor Shrestha,Pramen P. Shrestha,Mohamed Lohoud
出处
期刊:Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
[American Society of Civil Engineers]
日期:2023-04-12
卷期号:15 (3)
被引量:3
标识
DOI:10.1061/jladah.ladr-960
摘要
A cost database is essential for contractors to estimate accurate bid costs, and most contractors use historical cost databases for this purpose. Factors that influence bid cost should be investigated so that they are accurate. From the existing literature, this study identifies 30 factors that affect bid costs, and a survey was sent to 80 prime and subcontractors to determine the critical factors. The intraclass correlation test was conducted to determine the consistency of the responses. Then the Relative Importance Index (RII) was determined to identify the critical factors inhibiting the bid cost. In addition, the Mann-Whitney test was performed to determine whether the critical factors were highly ranked. Using RII and Mann-Whitney tests, the study determined seven critical factors that affect the bid cost of building projects: failure to track labor productivity; failure to report site-specific project conditions; failure to report complexity of the project; lacking documentation of union restrictions, regulations, local building code, and safety requirements; failure to report change order impact on labor productivity; failure to incorporate change orders into a cost control program; and failure to report project description. These findings will assist contractors to accurately bid building projects.
科研通智能强力驱动
Strongly Powered by AbleSci AI