织布机
编织
机制(生物学)
张力(地质)
张拉整体
机械系统
灵敏度(控制系统)
输电线路
直线(几何图形)
计算机科学
工程类
机械工程
模拟
控制工程
结构工程
电子工程
数学
电气工程
材料科学
物理
压缩(物理)
几何学
复合材料
量子力学
作者
Jian Yang,Xinrong Li,Yong Li Zhao,Guan Zhu Wang,Ze Xu Zhou
出处
期刊:Advanced Materials Research
日期:2012-01-01
卷期号:443-444: 1078-1083
标识
DOI:10.4028/www.scientific.net/amr.443-444.1078
摘要
As the long transmission line, complex mechanism, poor performance of regulation and control and low sensitivity of mechanical let-off, so it can not meets the requirements of stable tension. Therefore, the let-off mechanical was improved. This paper takes let-off system of SAURER400 rapier loom as experimental subject, mathematical modeling to every parts of loom, and takes simulation and comparison. The simulation results show the improvement of mechanical can meet the basic requirements of weaving, and it indicates the works that done former are effective and correct.
科研通智能强力驱动
Strongly Powered by AbleSci AI