计算机科学
可靠性工程
维护措施
最佳维护
调度(生产过程)
可靠性(半导体)
数学优化
能源消耗
整数规划
生产(经济)
预防性维护
元启发式
工程类
算法
数学
电气工程
物理
宏观经济学
经济
功率(物理)
量子力学
作者
Mani Sharifi,Mageed Ghaleb,Sharareh Taghipour
标识
DOI:10.1080/23302674.2023.2200888
摘要
The joint optimisation of production scheduling and maintenance planning can significantly decrease production interruptions (or stoppages) and, simultaneously, improve production stability and enhance the reliability and availability of equipment and machines. This paper studies the joint optimisation of production schedules and CBM plans in a parallel-machine production setting. The machines are subject to deterioration, unexpected breakdowns, and deterioration-based failures. The reliability of the machines is modelled as a multi-state system in which two deterioration thresholds are introduced to initiate maintenance and prevent deterioration-based failures. An integrated optimisation model is proposed to solve this new problem. The proposed model employs Markov chains to formulate machines’ reliability and a matrix-based approach to estimate the expected processing times, energy consumption, and maintenance costs. Then, a mixed-integer programming model is proposed that jointly optimises production schedules and maintenance plans by minimising a weighted sum objective function that includes expected lateness, maintenance, and energy consumption costs. A genetic algorithm (GA) is used to solve the new problem, and extensive computational experiments are performed to test the performance of the proposed GA. The results show the superiority of the proposed GA for all the test problems compared to two well-known metaheuristics.
科研通智能强力驱动
Strongly Powered by AbleSci AI