象限(腹部)
工程类
问卷调查
工作(物理)
价值(数学)
运营管理
业务
知识管理
计算机科学
机械工程
社会科学
医学
机器学习
病理
社会学
作者
Savindi Perera,Sachie Gunatilake
标识
DOI:10.1080/15623599.2020.1843110
摘要
Poor levels of efficiency are a prevalent concern for construction industries worldwide. Herein, Value Chain Management (VCM) is a concept that can help minimise organisational inefficiencies through in-depth insights into a firm’s operations. Aim of this study was to investigate the potential for construction contractor organisations to enhance the value addition to the client while improving efficiency through VCM principles. Mixed research approach was used. Data was collected using a questionnaire survey and expert interviews. Altogether, 50 (Value-adding activities) VAAs relevant for Sri Lankan construction organisations were identified, which were categorised under four groups of primary VAAs and six groups of secondary VAAs. The VAAs were further mapped into Importance Performance Analysis (IPA) Matrix based on their cost and the value addition resulting in 12 VAAs in quadrant I (concentrate here), 18 VAAs in quadrant II (keep up the good work) 12 VAAs in quadrant III (low priority), and 8 VAAs in quadrant IV (possible overkill). Reasons for lack of VC Analysis (VCA) were also identified and suggestions for improvement proposed. This research makes a significant contribution to enhancing the construction industry efficiency by providing guidance for decision-makers on the areas to concentrate on when it comes to implementing improvements.
科研通智能强力驱动
Strongly Powered by AbleSci AI