土方工程
建筑信息建模
过程(计算)
建筑工程
信息模型
工程类
软件
计算机科学
土木工程
运筹学
建筑工程
软件工程
运营管理
操作系统
岩土工程
程序设计语言
调度(生产过程)
出处
期刊:Procedia Engineering
[Elsevier]
日期:2017-01-01
卷期号:208: 203-210
被引量:35
标识
DOI:10.1016/j.proeng.2017.11.039
摘要
The article present the potential of using the BIM technology in the process of bills of quantities preparation for construction works. The article show the role of information collected in the model. The information entered into model and collected in the model during the design phase has a big impact on Bill of Quantities. The more detailed the information in the BIM model and as a result the more detailed description of the works in the BoQ make a cost calculation more accurate. As an example the paper presents the process of feeding information to the model based on selected construction works design software. Then, the paper presents the process of entering information on construction works and elements and the impact of entered information on bill of quantities on examples of earthworks, foundations and wall construction.
科研通智能强力驱动
Strongly Powered by AbleSci AI