发掘
合并(业务)
隧道施工
工程类
断层(地质)
岩体分类
岩土工程
土木工程
采矿工程
法律工程学
地质学
业务
会计
地震学
出处
期刊:Journal of North China Institute of Water Conservancy and Hydroelectric Power
日期:2001-01-01
摘要
This paper introduces the treatment technology of faults encountered during tunneling in the Putian water diversion Project. Particular measures such as consolidation of earth mass and support in advance have been taken before the commencement of excavation in order to keep the fault zone in a steady condition while tunneling. Safety construction was successfully guaranteed, and the approaches adopted are recommendable to various geological conditions which may cause difficulty to earth tunnel construction.
科研通智能强力驱动
Strongly Powered by AbleSci AI