海上风力发电
风力发电
可靠性工程
聚类分析
最佳维护
风速
马尔可夫链
维护措施
运筹学
计算机科学
工程类
气象学
地理
电气工程
机器学习
标识
DOI:10.1080/00207543.2023.2202280
摘要
A joint maintenance decision-making framework is proposed to optimise the long-term maintenance plan and lower the maintenance cost for offshore wind farms. The historical wind speed data are screened by using the method of k-means clustering, and Markov chains are established for the wind speed in different seasons. On this basis, the approach of Markov chain Monte Carlo is applied to simulate the distribution of repair vessel's waiting time for maintenance, where the impact of wind speed on maintenance availability is considered. Moreover, the components in wind turbines are divided into four states according to their effective ages, i.e. young, mature, old and failed, respectively. A maintenance decision model is established, with the objective to minimise maintenance cost. Besides, three types of opportunistic maintenance are considered, i.e. failure-based opportunistic maintenance (FBOM), event-based opportunistic maintenance (EBOM) and age-based opportunistic maintenance (ABOM), respectively. The enhanced elitist genetic algorithm (SEGA) is adopted to solve the optimisation problem. The results indicate that among the three types of opportunistic maintenance, ABOM can reduce maintenance cost more effectively, and it is more suitable for long-term maintenance plans of offshore wind farm.
科研通智能强力驱动
Strongly Powered by AbleSci AI