皮卡
计算机科学
还原(数学)
功率(物理)
多样性(政治)
可靠性工程
工程类
数学
人工智能
图像(数学)
物理
几何学
量子力学
社会学
人类学
作者
Vishal Kumar,H.C.R. Kumar,Indra Gupta,H.O. Gupta
出处
期刊:IEEE Transactions on Power Delivery
[Institute of Electrical and Electronics Engineers]
日期:2009-12-16
卷期号:25 (1): 398-406
被引量:140
标识
DOI:10.1109/tpwrd.2009.2033969
摘要
The additional power demand caused by cold load pickup (CLPU) condition restricts the simultaneous restoration of all the loads of a network due to excessive loading on the network elements and violation of limits. Therefore, step-by-step restoration is the most adopted approach. However, it requires long time for the complete restoration. The main cause of CLPU problem is the loss of diversity amongst the loads which causes the enduring phase of CLPU condition. The conservation of load diversity reduces the demand during restoration. In the proposed approach, the diversity is conserved by using distributed generation (DG) for quick restoration and the reduction of additional power demand caused by CLPU condition. The capacity required for DG is evaluated on the basis of the required additional power demand and the load-diversity preserved. The proposed approach utilizes the genetic algorithm for determination of the optimal size and location of the required DG. The approach is demonstrated on a 33-bus, 12.66-kV primary distribution network.
科研通智能强力驱动
Strongly Powered by AbleSci AI