Impact of Contractual Flexibility on BIM-Enabled PPP Project Performance during the Construction Phase

采购 灵活性(工程) 结构方程建模 项目管理 建筑信息建模 施工管理 业务 过程管理 框架(结构) 合同管理 知识管理 运营管理 工程类 计算机科学 系统工程 营销 土木工程 管理 经济 机器学习 调度(生产过程)
作者
Yongshun Xu,Heap‐Yih Chong,Ming Chi
出处
期刊:Journal of Infrastructure Systems [American Society of Civil Engineers]
卷期号:28 (1) 被引量:14
标识
DOI:10.1061/(asce)is.1943-555x.0000671
摘要

Building information modeling (BIM) and public–private partnerships (PPPs) have been well-received for their technological and organizational innovations in construction projects. However, due to the complexity nature and project changes of BIM-enabled PPP procurement, an effective and flexible contract remains an unresolved agenda. Hence, this research aims to determine the relationship between contractual flexibility and BIM-enabled PPP project performance, particularly for its project performance during the construction phase. Data were collected through questionnaire surveys. A total of 177 valid responded questionnaires were collected from PPP practitioners under their BIM-enabled PPP projects and analyzed using a structural equation modeling (SEM) method. The results reveal both content flexibility and executing flexibility have a significant positive impact on the performance of BIM-enabled PPP projects during the construction phase, while the effect of executing flexibility is greater than the content flexibility. This research has uncovered a positive effect of contract content flexibility on contract execution flexibility for the first time, which sheds light on appropriate contract framing for governing stakeholders' relationships in BIM-enabled PPP projects, which is an area that has not been explored in the previous literature. More importantly, it proves the important role of contract flexibility for BIM-enabled PPP projects and helps to effectively promote and use BIM and PPPs in the construction industry. A conceptual framework has also been developed to provide practical references and strategies for future implementation and contract design in BIM-enabled PPP projects, adding new knowledge of construction management both theoretically and practically.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
凉月发布了新的文献求助10
1秒前
浮游应助shizi采纳,获得10
1秒前
1秒前
结实智宸应助尔尔采纳,获得10
2秒前
烟花应助llwwtt采纳,获得10
2秒前
小鱼儿发布了新的文献求助10
3秒前
荔枝发布了新的文献求助10
3秒前
4秒前
4秒前
4秒前
勤劳雪糕完成签到,获得积分10
5秒前
酷波er应助结实初翠采纳,获得10
7秒前
王缪芸发布了新的文献求助10
8秒前
meo发布了新的文献求助10
9秒前
夜无疆发布了新的文献求助10
9秒前
JHY完成签到,获得积分10
9秒前
852应助正直的雁开采纳,获得10
10秒前
科目三应助limo采纳,获得10
10秒前
10秒前
NexusExplorer应助WAR708采纳,获得10
11秒前
11秒前
充电宝应助smile采纳,获得10
11秒前
星辰大海应助清新的老三采纳,获得10
12秒前
12秒前
谨慎的猎豹完成签到,获得积分20
12秒前
13秒前
什么完成签到,获得积分10
14秒前
15秒前
JJ发布了新的文献求助10
15秒前
liuhll完成签到,获得积分20
15秒前
大方不凡完成签到 ,获得积分10
16秒前
16秒前
勤劳雪糕发布了新的文献求助10
17秒前
17秒前
结实智宸应助J_C_Van采纳,获得10
17秒前
meo完成签到,获得积分10
18秒前
完美世界应助小何采纳,获得10
18秒前
20秒前
虔三愿发布了新的文献求助10
20秒前
JHY发布了新的文献求助20
20秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Pipeline and riser loss of containment 2001 - 2020 (PARLOC 2020) 1000
A Half Century of the Sonogashira Reaction 1000
Artificial Intelligence driven Materials Design 600
Investigation the picking techniques for developing and improving the mechanical harvesting of citrus 500
Phylogenetic study of the order Polydesmida (Myriapoda: Diplopoda) 500
A Manual for the Identification of Plant Seeds and Fruits : Second revised edition 500
热门求助领域 (近24小时)
化学 医学 生物 材料科学 工程类 有机化学 内科学 生物化学 物理 计算机科学 纳米技术 遗传学 基因 复合材料 化学工程 物理化学 病理 催化作用 免疫学 量子力学
热门帖子
关注 科研通微信公众号,转发送积分 5184186
求助须知:如何正确求助?哪些是违规求助? 4370168
关于积分的说明 13608935
捐赠科研通 4222113
什么是DOI,文献DOI怎么找? 2315662
邀请新用户注册赠送积分活动 1314220
关于科研通互助平台的介绍 1263142