Lv5
1270 积分 2024-03-10 加入
The failure patterns and analysis process of drill pipes in oil and gas well: A case study of fracture S135 drill pipe
1天前
已完结
Development of Low Force Shear Blades for High Strength Coiled Tubing
2个月前
已关闭
New Shear Ram Development via Digital Toolkit and Multiple Objective Optimization Process
3个月前
已完结
Force prediction and influencing factors analysis of the coiled tubing blowout preventer in the shearing process
8个月前
已完结