标题 |
Optimized scheduling of resource-constraints in projects for smart construction
智能施工项目资源约束的优化调度
相关领域
粒子群优化
数学优化
计算机科学
调度(生产过程)
启发式
遗传算法
元启发式
多群优化
群体行为
持续时间(音乐)
数学
艺术
文学类
|
网址 | |
DOI | |
其它 | In real-life applications, resources in construction projects are always limited. It is of great practical importance to shorten the project duration by using intelligent models (i.e., evolutionary computations such as genetic algorithm (GA) and particle swarm optimization (PSO) to make the construction process reasonable considering the limited resources. However, in the general EC-based model, for example, PSO easily falls into a local optimum when solving the problem of limited resources and the shortest period in scheduling a large network. |
求助人 | |
下载 | 该求助完结已超 24 小时,文件已从服务器自动删除,无法下载。 |
温馨提示:该文献已被科研通 学术中心 收录,前往查看
科研通『学术中心』是文献索引库,收集文献的基本信息(如标题、摘要、期刊、作者、被引量等),不提供下载功能。如需下载文献全文,请通过文献求助获取。
|