风力发电
地铁列车时刻表
工作(物理)
工程类
过程(计算)
评价方法
可靠性工程
运筹学
运输工程
计算机科学
机械工程
电气工程
操作系统
作者
Yajing Wu,Wen Jun Chen,Li Yang
出处
期刊:Advanced Materials Research
日期:2013-07-01
卷期号:722: 86-92
被引量:1
标识
DOI:10.4028/www.scientific.net/amr.722.86
摘要
Chinese wind power has undergone a rapid development under the support from government and technology progress, which caused a discordant situation with the backward of its post-evaluation work. Currently, a comprehensive post-evaluation index system and evaluation methods has not been established, the result of current evaluation cannot help the decision-making for the follow-up projects and the further improvement of the operational status of wind farm. However, since the end of 2010, there are more and more problems exposed in wind powers development. It is necessary to develop a comprehensive and scientific post-evaluation on Chinese wind power project. This research contains two parts, the first part constructed a whole-process post-evaluation model on wind power project, the second part developed a target completion degree post-evaluation model from terms of cost, quality, schedule, safety and environment. What is more, the literature about wind power project evaluation was analyzed in this paper.
科研通智能强力驱动
Strongly Powered by AbleSci AI