计算机科学
经济
计量经济学
业务
指数平滑
需求管理
作者
Sarah Van der Auweraer,Robert Boute,Aris A. Syntetos
标识
DOI:10.1016/j.ijforecast.2018.09.002
摘要
The classical spare part demand forecasting literature studies methods for forecasting intermittent demand. However, the majority of these methods do not consider the underlying demand-generating factors. The demand for spare parts originates from the replacement of parts in the installed base of machines, either preventively or upon breakdown of the part. This information from service operations, which we refer to as installed base information, can be used to forecast the future demand for spare parts. This paper reviews the literature on the use of such installed base information for spare part demand forecasting in order to asses (1) what type of installed base information can be useful; (2) how this information can be used to derive forecasts; (3) the value of using installed base information to improve forecasting; and (4) the limits of the existing methods. This serves as motivation for future research.
科研通智能强力驱动
Strongly Powered by AbleSci AI