澄清器
曝气
活性污泥
硝化作用
反硝化
环境科学
环境工程
生化需氧量
混合液悬浮物
同步硝化反硝化
悬浮物
化学需氧量
废物管理
污水处理
氮气
化学
废水
工程类
有机化学
作者
John Fillos,Vasil Diyamandoğlu,L. Carrio,Lawrence Baylor Robinson
标识
DOI:10.2175/106143096x127325
摘要
Establishment of nitrification and denitrification in an existing conventional, step‐feed activated sludge plant designed for suspended solids and carbonaceous biochemical oxygen demand removal was evaluated in a full‐scale study at the Tallman Island Water Pollution Control Plant in New York City. One of four biological treatment batteries consisting of an aeration tank and two rectangular secondary clarifiers was isolated from the rest of the plant and was used for the study. Nitrification rates and their temperature dependency were determined using NH 3 ‐N and NO 3 ‐N profiles developed along the aeration tank during the summer and winter months. The data suggested the occurrence of simultaneous nitrification and denitrification in the aeration tank. Virtually complete denitrification was observed within the sludge blanket of the secondary clarifier.
科研通智能强力驱动
Strongly Powered by AbleSci AI