水煤气变换反应
膜反应器
木材气体发生器
制氢
氢
化学工程
化学
整体气化联合循环
合成气
材料科学
工艺工程
煤
有机化学
工程类
作者
Huanhao Chen,Mingyuan Cao,Linghao Zhao,Richard Ciora,Paul K.T. Liu,Vasilios I. Manousiouthakis,Theodore T. Tsotsis
标识
DOI:10.1021/acs.iecr.8b02653
摘要
We present here a preliminary experimental study of a novel reactor configuration, consisting of a membrane reactor (MR) followed by two adsorptive reactors (ARs) in parallel, operating alternately, utilized for the production of high-purity hydrogen with simultaneous CO2 capture during the water–gas shift (WGS) reaction treating a coal gasifier off-gas. In the study, we used a commercial sour-shift WGS catalyst (Co/Mo/Al2O3) in both the MR and the AR. A carbon molecular sieve (CMS) membrane was used in the MR, and a hydrotalcite adsorbent was used in the AR. The experimental results show that membrane, catalyst, and adsorbent all operated stably under the integrated gasification combined cycle (IGCC)-relevant conditions. The MR–AR reactor sequence displayed performance superior to that of a conventional packed-bed reactor (PBR) with near 100% conversions attained while the ARs are functional (with an ultrapure hydrogen stream exiting the AR and permeate-side hydrogen purities from the MR of ∼75–80%). Thus, these findings manifest the ability of the hybrid MR–AR process configuration to operate properly under the desired conditions and to intensify the efficiency of the WGS reaction, as well as to validate its potential to function as a high-efficiency, ultra-compact process for incorporation into IGCC power plants for environmentally benign power generation with pre-combustion CO2 capture.
科研通智能强力驱动
Strongly Powered by AbleSci AI