Ex Post Project Risk Assessment: Method and Empirical Study

风险管理计划 风险管理 项目风险管理 风险分析(工程) 事前 鉴定(生物学) 分类 IT风险管理 信息风险的因子分析 风险评估 运营管理 项目管理 项目管理三角形 业务 精算学 计算机科学 风险管理信息系统 工程类 信息系统 财务 经济 系统工程 人工智能 宏观经济学 电气工程 管理信息系统 计算机安全 植物 生物
作者
Abdolmajid Erfani,Zihui Ma,Qingbin Cui,Gregory B. Baecher
出处
期刊:Journal of the Construction Division and Management [American Society of Civil Engineers]
卷期号:149 (2) 被引量:8
标识
DOI:10.1061/jcemd4.coeng-12588
摘要

Project risk is an important part of managing large projects of any sort. This study contributes to the state of knowledge in project risk management by introducing a data-driven approach to measure risk identification performance using historical data. In the early phases of a project, the identification and assessment of risk is based largely on experience and expert judgment. As a project moves through its life cycle, these identified risks and the assessment of them evolve. Some risks become issues, some are mitigated, and some are retired as no longer important. This study investigated the quality of early risk registers and risk assessments on large transportation projects and compared them to how the identified risks evolved on historical projects. The investigation involved the use of textual analysis of archival risk register documents. Finite-state automation methods akin to Markov chain models were used to track the changes in risk attributes on large infrastructure projects as the projects matured. The objective was to be better able to anticipate how project risks will change as projects move forward and to be better able to forecast changes to the risk register from ex ante to ex post conditions. Results from 11 major US transportation projects suggested that, on average, fewer than 65% of ex ante identified risks ultimately occurred in projects and were mitigated, while more than 35% did not occur and were retired. In addition, more than half of the risks emerged during project execution when new information became available. Based on the categorization of risk management styles, we find that identifying risks early in the project life cycle is necessary, but not sufficient to ensure successful project delivery. A project team with positive doer behavior (i.e., actively monitoring and identifying risks during project execution) performed better in delivering projects on time and within budget.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
HaoHao04发布了新的文献求助10
1秒前
阳光忆寒完成签到,获得积分10
1秒前
积极以云完成签到,获得积分10
1秒前
2秒前
2秒前
开心一凤发布了新的文献求助10
2秒前
周em12_发布了新的文献求助10
2秒前
Hello应助argwew采纳,获得10
3秒前
DavidWebb完成签到,获得积分10
3秒前
医生大王发布了新的文献求助10
3秒前
3秒前
lookahead发布了新的文献求助10
4秒前
万豪发布了新的文献求助10
4秒前
4秒前
香风智乃完成签到 ,获得积分10
5秒前
5秒前
司徒乌发布了新的文献求助20
6秒前
SYLH应助科研通管家采纳,获得10
6秒前
爱你呃不可能应助Chelsea采纳,获得20
6秒前
科研通AI5应助科研通管家采纳,获得10
6秒前
搜集达人应助科研通管家采纳,获得10
6秒前
大模型应助科研通管家采纳,获得30
6秒前
SYLH应助科研通管家采纳,获得10
6秒前
科研通AI2S应助科研通管家采纳,获得10
6秒前
6秒前
6秒前
徐裘应助科研通管家采纳,获得10
6秒前
6秒前
uiwh发布了新的文献求助10
6秒前
科研通AI5应助科研通管家采纳,获得10
6秒前
wanci应助科研通管家采纳,获得10
7秒前
7秒前
完美世界应助科研通管家采纳,获得10
7秒前
SYLH应助科研通管家采纳,获得10
7秒前
zkylh应助科研通管家采纳,获得10
7秒前
7秒前
sa完成签到 ,获得积分10
7秒前
sakurai应助科研通管家采纳,获得10
7秒前
彭于晏应助科研通管家采纳,获得10
7秒前
爆米花应助科研通管家采纳,获得10
7秒前
高分求助中
Continuum Thermodynamics and Material Modelling 3000
Production Logging: Theoretical and Interpretive Elements 2700
Mechanistic Modeling of Gas-Liquid Two-Phase Flow in Pipes 2500
Structural Load Modelling and Combination for Performance and Safety Evaluation 1000
Conference Record, IAS Annual Meeting 1977 610
電気学会論文誌D(産業応用部門誌), 141 巻, 11 号 510
Time Matters: On Theory and Method 500
热门求助领域 (近24小时)
化学 材料科学 生物 医学 工程类 有机化学 生物化学 物理 纳米技术 计算机科学 内科学 化学工程 复合材料 基因 遗传学 物理化学 催化作用 量子力学 光电子学 冶金
热门帖子
关注 科研通微信公众号,转发送积分 3560580
求助须知:如何正确求助?哪些是违规求助? 3134540
关于积分的说明 9408040
捐赠科研通 2834699
什么是DOI,文献DOI怎么找? 1558213
邀请新用户注册赠送积分活动 727980
科研通“疑难数据库(出版商)”最低求助积分说明 716656