调度(生产过程)
流水车间调度
动态优先级调度
计算机科学
工业工程
分布式计算
两级调度
作业车间调度
整数规划
数学优化
运筹学
工程类
算法
地铁列车时刻表
数学
操作系统
作者
Khalil Tliba,Thierno Diallo,Olivia Penas,Romdhane Ben Khalifa,Noureddine Ben Yahia,Mohamed Haddar
标识
DOI:10.1007/s10845-022-01922-3
摘要
Industries require, nowadays, to be more adaptable to unforeseen real-time events as well as to the rapid evolution of their market (e.g. multiplication of customers, increasingly personalized and unpredictable demand, etc.). To meet these challenges, manufacturers need new solutions to update their production plan when a change in the production system or its environment occurs. In this context, our research work deals with a dynamic scheduling problem of a real Hybrid Flow Shop considering the specific constraints of a perfume manufacturing company. This paper proposes a Digital Twin-driven dynamic scheduling approach based on the combination of both optimization and simulation. For the optimization, we have developed a mixed integer linear programming (MILP) scheduling model taking into account the main specific scheduling requirements of our case study. Regarding the simulation approach, a 3D shop floor model has been developed including the additional stochastic aspects and constraints which are difficult or impossible to model with a MILP approach. These two models are connected with the real shop floor to create a digital twin (DT). The developed DT allows the re-scheduling of production according to internal and external events. Finally, validation scenarios on a perfume case study have been designed and implemented in order to demonstrate the feasibility and the relevance of the proposed digital twin-driven dynamic scheduling approach.
科研通智能强力驱动
Strongly Powered by AbleSci AI