Zhaojing Wang,Yi‐Sheng Liu,Hao Hu,Lei Dai
出处
期刊:Journal of the Construction Division and Management
[American Society of Civil Engineers]
日期:2021-04-01
卷期号:147 (4)
被引量:10
标识
DOI:10.1061/(asce)co.1943-7862.0001976
摘要
Increased emphasis is currently placed on precast production scheduling due to the upward-trending applications of precast technology. However, existing studies primarily focused on static scheduling, and few of them addressed dynamic rescheduling problems subject to disruptions from individual products without considering constraints in the practical environment. In this paper, a hybrid rescheduling optimization model for precast production is proposed to minimize rescheduling costs and ensure on-time delivery under disruptions of machine breakdown. The rescheduling was first optimized based on the genetic algorithm considering the idle time of multiple production lines, time intervals, and operation characteristics in precast production. Subsequently, the feasibility of potential reschedules was further verified via simulating production uncertainties in a real-world environment to achieve a trade-off between a high service level and profit maximization. Finally, a case study with different realistic scenarios was conducted to prove the superiority of the model in comparison with other methods. This methodology will increase the applicability of rescheduling methods in practice and reduce production costs of components in precast construction.
科研通智能强力驱动
Strongly Powered by AbleSci AI