调度(生产过程)
数学优化
整数规划
计算机科学
预处理器
闭环
作业车间调度
分解
过程(计算)
二进制数
工程类
数学
控制工程
布线(电子设计自动化)
人工智能
算术
操作系统
生态学
生物
计算机网络
作者
Shan Lu,Chen Chen,Yue Wang,Zhe Li,Xinchao Li
标识
DOI:10.1016/j.aei.2022.101848
摘要
This paper studies coordinated scheduling of production and logistics for a large-scale closed-loop manufacturing system by integrating its manufacturing and recycling process. In addition to the forward manufacturing process, different recycling units in reverse recycling process are also studied. A decentralized network is designed to formulate the coordinated scheduling problem as a mixed integer programming model with both binary and integer variables. As the problem for closed-loop manufacturing is large-scale and computational-consuming in nature, the model is divided into integer variable sub-models and complex binary variable sub-models for preprocessing and reprocessing respectively. An iterative solution approach by Benders decomposition is developed to accelerate the solving efficiency in large-scale case by updating custom constraints. A case study is conducted to investigate the managerial implications of the decentralized network for the closed-loop manufacturing system. Computational experiments demonstrate the validity and efficiency of the proposed iterative solution approach for the large-scale scenarios.
科研通智能强力驱动
Strongly Powered by AbleSci AI