机组调度
TRIPS体系结构
列生成
调度(生产过程)
船员
计算机科学
稳健性(进化)
车队管理
运筹学
运输工程
工程类
数学优化
运营管理
航空学
化学
基因
生物化学
数学
作者
Bastian Amberg,Boris Amberg
出处
期刊:Transportation Science
[Institute for Operations Research and the Management Sciences]
日期:2022-06-29
卷期号:57 (1): 82-105
被引量:5
标识
DOI:10.1287/trsc.2022.1154
摘要
For vehicle and crew scheduling in public bus transport, two concepts are intensively studied to reduce resource usage and minimize operational costs: Integrated, that is, simultaneous scheduling of vehicles and drivers, and resource scheduling with simultaneous trip shifting, that is, slightly modifying departure and arrival times of particular trips without changing their duration. Applying these two concepts can lead to highly cost-efficient and tight schedules. Unfortunately, such schedules are more susceptible to delays during operations. Furthermore, shifting of particular trips may have an unwanted impact on the original timetable structure as, for example, headways between consecutive trips of a line might be changed. In this work, we develop an integrated vehicle and crew scheduling approach with the possibility to shift scheduled trips controllably within small defined time windows. It is a Lagrangian heuristic based on column generation. In addition to minimizing planned costs, the approach aims at two further objectives: building robust schedules by minimizing the expected overall propagation of delays through the transport network and minimizing timetable alteration. To reduce the possible propagation of delays, the mutual dependencies between vehicle and crew schedules are taken into account during integrated scheduling. To increase both robustness and cost-efficiency, the possibility to shift trips within small defined time windows is used. Robust and cost-efficient vehicle itineraries and crew duties are generated in the column-generation pricing problems. Computational experiments on data sets from the real world show that resource usage can be further reduced compared with pure cost-efficient integrated scheduling, whereas resource schedules remain robust and timetable alterations can be minimized. Supplemental Material: The online appendix is available at https://doi.org/10.1287/trsc.2022.1154 .
科研通智能强力驱动
Strongly Powered by AbleSci AI