计算机科学
流水车间调度
作业车间调度
数学优化
汽车工业
调度(生产过程)
缩小
整数规划
背景(考古学)
工业工程
运筹学
算法
数学
工程类
古生物学
生物
地铁列车时刻表
航空航天工程
操作系统
作者
José Renatho da Silva Santana,Hélio Yochihiro Fuchigami
标识
DOI:10.1080/21681015.2024.2370847
摘要
We addressed the multistage assembly flow shop problem with post-processing and makespan minimization, a production environment commonly encountered in diverse industries such as automotive, dental, medical equipment, and clothing manufacturing. In this context, we presented an innovative mixed-integer linear programming model with a position-based strategy. Our proposed formulation demonstrated remarkable efficiency when compared to the model of the literature. It achieved optimal solutions in 77.16% of instances, with an average optimality gap of 10.59%. This study constitutes a significant contribution to the efficient resolution of a practical and frequently encountered scheduling problem that has received relatively limited attention in existing literature. The findings highlight the crucial role of mathematical optimization models as valuable decision-making tools for scheduling within the addressed production system.
科研通智能强力驱动
Strongly Powered by AbleSci AI