微电网
继电器
切换
计算机科学
粒子群优化
网格
水准点(测量)
最优化问题
乘数(经济学)
职位(财务)
电力系统
控制理论(社会学)
数学优化
功率(物理)
数学
算法
物理
几何学
控制(管理)
大地测量学
财务
量子力学
人工智能
地理
经济
宏观经济学
操作系统
作者
Mrutyunjay Senapati,Pratap Kumar Panigrahi,Prakas K Ray,Asit Mohanty
标识
DOI:10.1109/isssc56467.2022.10051512
摘要
Due to the switchover in the operation pattern from grid-connected position to the islanded one, there is a considerable and frequent fluctuation with respect to short current position in the microgrid. As a result, this observed change in the network will have an impact on the over current scheme. Further, there will be a delay in the over current relay (OCR) operational time or perhaps a failure to isolate problems inside the microgrid. In this study, optimization of the Time Multiplier Setting (TMS) of the over-current relay is carried out in order to tackle the problem of coordination of OCRs. The undesirable industrial relay limitations and restrictions are also articulated as optimization constraints in this study. Particle Swarm Optimization(PSO) is used to compare the outcomes of the given optimization strategy. With the IEC Microgrid Benchmark, the suggested approach’s efficacy and potency are evaluated. The model-750/760 over-current relay from GE- Multilin is used in ETAP to verify the results.
科研通智能强力驱动
Strongly Powered by AbleSci AI