期刊:Dams and Reservoirs [Thomas Telford Ltd.] 日期:2024-06-27卷期号:34 (3): 113-120被引量:1
标识
DOI:10.1680/jdare.2024.9
摘要
This project involved undertaking a stability analysis of an unreinforced concrete gravity dam. The stability assessment considered the 1 in 10 000 year and probable maximum flood events as well as the effects of ice and seismic loading, concluding that the above-ground dam section did not meet modern factors of safety and that further works would be required to stabilise the dam.