Deepanshu Arora,Gopal Krishna Agarwal
标识
DOI:10.1504/ijaom.2016.076203
摘要
The right approach towards the optimisation of multi-objective nonlinear problem is the incremental adoption of available techniques and strategies that help to minimise the solution time and to improve the optimised results. Meta-heuristics are heuristic methods that help the search through the solution space using algorithms. Meta-heuristics further improve the solution that comes initially from heuristics. This paper presents various types of meta-heuristics approaches for optimising flowshop scheduling (FSS) with focus on minimising parameters like total tardiness, total earliness, maximum makespan, total no. of tardy jobs, etc. Since the problem is NP-hard, the meta-heuristics and hybrid meta-heuristics are most appropriate methods to solve this kind of problem. Meta-heuristics are projected as strategic means to achieve the optimum and efficient schedule, with positive impact on cost minimisation (economies of scale) and simultaneously reducing solution time.
科研通智能强力驱动
Strongly Powered by AbleSci AI