Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components

调度(生产过程) 计算机科学 流水车间调度 生产计划 批量生产 地铁列车时刻表 生产进度表 工业工程 生产(经济) 作业车间调度 数学优化 工程类 运营管理 数学 经济 宏观经济学 操作系统
作者
Juan Du,Yan Xue,Vijayan Sugumaran,Min Hu,Peng Dong
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
卷期号:30 (4): 1601-1635 被引量:34
标识
DOI:10.1108/ecam-04-2021-0311
摘要

Purpose For prefabricated building construction, improper handling of the production scheduling for prefabricated components is one of the main reasons that affect project performance, which causes overspending, schedule overdue and quality issues. Prior research on prefabricated components production schedule has shown that optimizing the flow shop scheduling problem (FSSP) is the basis for solving this issue. However, some key resources and the behavior of the participants in the context of actual prefabricated components production are not considered comprehensively. Design/methodology/approach This paper characterizes the production scheduling of the prefabricated components problem into a permutation flow shop scheduling problem (PFSSP) with multi-optimization objectives, and limitation on mold and buffers size. The lean construction principles of value-based management (VBM) and just-in-time (JIT) are incorporated into the production process of precast components. Furthermore, this paper applies biogeography-based optimization (BBO) to the production scheduling problem of prefabricated components combined with some improvement measures. Findings This paper focuses on two specific scenarios: production planning and production rescheduling. In the production planning stage, based on the production factor, this study establishes a multi-constrained and multi-objective prefabricated component production scheduling mathematical model and uses the improved BBO for prefabricated component production scheduling. In the production rescheduling stage, the proposed model allows real-time production plan adjustments based on uncertain events. An actual case has been used to verify the effectiveness of the proposed model and the improved BBO. Research limitations/implications With respect to limitations, only linear weighted transformations are used for objective optimization. In regards to research implications, this paper considers the production of prefabricated components in an environment where all parties in the supply chain of prefabricated components participate to solve the production scheduling problem. In addition, this paper creatively applies the improved BBO to the production scheduling problem of prefabricated components. Compared to other algorithms, the results show that the improved BBO show optimized result. Practical implications The proposed approach helps prefabricated component manufacturers consider complex requirements which could be used to formulate a more scientific and reasonable production plan. The proposed plan could ensure the construction project schedule and balance the reasonable requirements of all parties. In addition, improving the ability of prefabricated component production enterprises to deal with uncertain events. According to actual production conditions (such as the occupation of mold resources and storage resources of completed components), prefabricated component manufacturers could adjust production plans to reduce the cost and improve the efficiency of the whole prefabricated construction project. Originality/value The value of this article is to provide details of the procedures and resource constraints from the perspective of the precast components supply chain, which is closer to the actual production process of prefabricated components. In addition, developing the production scheduling for lean production will be in line with the concept of sustainable development. The proposed lean production scheduling could establish relationships between prefabricated component factory manufacturers, transportation companies, on-site contractors and production workers to reduce the adverse effects of emergencies on the prefabricated component production process, and promote the smooth and efficient operation of construction projects.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
了尘完成签到,获得积分10
刚刚
可靠从云完成签到 ,获得积分10
1秒前
zzzx完成签到,获得积分10
2秒前
科研通AI5应助精明的期待采纳,获得10
2秒前
2秒前
华仔应助QZZ采纳,获得10
4秒前
wnll完成签到,获得积分10
5秒前
科研通AI5应助好困采纳,获得10
7秒前
wnll发布了新的文献求助10
7秒前
kinzer完成签到 ,获得积分10
8秒前
9秒前
LM完成签到,获得积分20
9秒前
orixero应助科研通管家采纳,获得10
10秒前
wddddd发布了新的文献求助10
12秒前
15秒前
jscr完成签到,获得积分10
16秒前
畅快的谷秋完成签到 ,获得积分10
17秒前
清风徐来完成签到,获得积分10
18秒前
孤独从云应助陈秋采纳,获得10
18秒前
wddddd完成签到,获得积分10
18秒前
听话的醉冬完成签到 ,获得积分10
20秒前
研友_O8Wz4Z完成签到,获得积分10
22秒前
啊啊啊啊发布了新的文献求助10
22秒前
23秒前
世上僅有的榮光之路完成签到,获得积分0
23秒前
23秒前
科研小白完成签到,获得积分10
24秒前
Jasmineyfz完成签到 ,获得积分10
24秒前
临床医学研究中心完成签到,获得积分10
24秒前
EW完成签到,获得积分10
25秒前
沉淀发布了新的文献求助10
28秒前
流浪的鲨鱼完成签到,获得积分20
29秒前
布可完成签到,获得积分10
30秒前
肖雪依完成签到,获得积分10
36秒前
夏沫完成签到,获得积分10
37秒前
清浅溪完成签到 ,获得积分10
38秒前
小董完成签到,获得积分10
39秒前
来自3602完成签到,获得积分10
39秒前
冷静茉莉完成签到 ,获得积分10
40秒前
清脆初晴完成签到,获得积分10
40秒前
高分求助中
All the Birds of the World 3000
Weirder than Sci-fi: Speculative Practice in Art and Finance 960
IZELTABART TAPATANSINE 500
Introduction to Comparative Public Administration: Administrative Systems and Reforms in Europe: Second Edition 2nd Edition 300
Spontaneous closure of a dural arteriovenous malformation 300
GNSS Applications in Earth and Space Observations 300
Not Equal : Towards an International Law of Finance 260
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 物理 生物化学 纳米技术 计算机科学 化学工程 内科学 复合材料 物理化学 电极 遗传学 量子力学 基因 冶金 催化作用
热门帖子
关注 科研通微信公众号,转发送积分 3725514
求助须知:如何正确求助?哪些是违规求助? 3270437
关于积分的说明 9965810
捐赠科研通 2985453
什么是DOI,文献DOI怎么找? 1638024
邀请新用户注册赠送积分活动 777792
科研通“疑难数据库(出版商)”最低求助积分说明 747261