作者
Fengle Yang,Hairui Zhang,Xianzhi Zhang,Zhang Yan,Jinhua Li,Fangming Jin,Baoxue Zhou
摘要
The decentralized wastewater treatment is considered as an effective way to control the water pollution in rural areas and it has been rapidly developed in many countries. However, there is still a lack of analysis and evaluation of the operation of treatment facilities. Herein, rural decentralized wastewater treatment facilities of 146 sets distributed in ten villages and towns of the Dali City surrounding the Erhai Lake, were analyzed and evaluated for one whole year. The running status, treatment technologies including anaerobic-anoxic-oxic membrane bio-reactor (A 2 /O-MBR) facultative membrane bio-reactor (FMBR) and soil purification tank (SPT) were identified, and only 94 sets were in normal running status during the whole year of four times evaluation, with a total yearly serviceability ratio of 64.4%. The 94 sets facilities in normal running status, including 55 sets of A 2 /O-MBR, 33 sets of FMBR and 6 sets of STP, exhibited annual average removal efficiency of 73.7% total nitrogen (TN), 87.6% ammonia nitrogen (NH 3 -N), 72.0% chemical oxygen demand (COD), 83.6% biochemical oxygen demand (BOD 5 ) and 56.9% total phosphorus (TP). The annual average standard-achieving ratio of 94 sets facilities for COD and BOD 5 reached more than 70%, whereas it was 44.68% and 55.32% for TN and NH 3 –N. Particularly, it was merely 4.26% for TP, suggesting that how to improve TP treatment efficiency is the primary target in future research. The A 2 /O-MBR in normal running status could achieve an annual removal efficiency of 75.5% TN, 89.4% NH 3 -N, 64.1% TP and 72.8% COD, which demonstrated a significant advantage in organics degradation, denitrification, and dephosphorization. In contrast, the FMBR demonstrated a weaker capability for removing phosphates, whereas the SPT showed a lower nitrogen removal. On this basis, some suggestions in design, operation, and management are put forward. • The operation performance of 146 sets of village sewage treatment facilities were evaluate. • Three treatment techniques including A 2 /O–MBR, FMBR, SPT were analyzed and compared. • The facilities exhibited high removal efficiency but only with a total yearly serviceability of 64.4%. • An improved TP treatment efficiency is the primary target to be solved in future research.