控制理论(社会学)
瞬态(计算机编程)
信号(编程语言)
切换时间
计算机科学
瞬态响应
传递函数
控制器(灌溉)
传输(计算)
控制工程
控制(管理)
工程类
生物
操作系统
电气工程
人工智能
并行计算
程序设计语言
农学
作者
Weizhong Chen,Yan Shi,Zhongyang Fei
标识
DOI:10.1016/j.nahs.2022.101327
摘要
In this paper, the time and switching signal scheduled bumpless transfer control (BTC) is addressed for switched systems with non-weighted L2-gain property. Considering that abrupt bumps of the controller at switching instants may lead to transient resonance effects or even failure of the system, a new BTC strategy is presented to alleviate control bumps. First, based on an introduced time scheduler, we propose the concept of the time and switching signal scheduled bumpless transfer (BT) performance. Then, by constructing a novel multiple discontinuous Lyapunov functional, relaxed criteria are established for the mixed L2-gain/switching signal scheduled BT performance of switched systems. Furthermore, tighter switching signals and time-dependent controllers are co-designed to accomplish both switching transient and L2-gain performance of the closed-loop system. Finally, an experiment on a hardware-in-the-loop of an aero-engine system is implemented to illustrate the validity and merits of the derived results.
科研通智能强力驱动
Strongly Powered by AbleSci AI