回旋管
核工程
输电线路
托卡马克
回旋加速器
概念设计
电力传输
天线(收音机)
尺寸
传输(电信)
微波食品加热
物理
直线(几何图形)
电气工程
计算机科学
核物理学
电信
等离子体
电子
工程类
人机交互
数学
艺术
视觉艺术
几何学
作者
F. Gandini,T. Bigelow,B. Becket,J. B. O. Caughman,D. Cox,C. Darbos,T. Gassmann,M. Henderson,O. Jean,K. Kajiwara,Noriyuki Kobayashi,C. Nazare,Y. Oda,T. Omori,D. Purohit,D. A. Rasmussen,D. Ronden,G. Saibene,K. Sakamoto,Michael A. Shapiro,Koji Takahashi,Richard J. Temkin
摘要
The transmission line (TL) subsystem associated with the ITER electron cyclotron heating and current drive system has reached the conceptual design maturity. At this stage the responsibility of finalizing the design has been transferred from the ITER Organization to the U.S. Domestic Agency. The purpose of the TL is to transmit the microwaves generated by the 170-GHz gyrotrons installed in the radio-frequency building to the launchers located in one equatorial and four upper tokamak ports. Each TL consists of evacuated HE11 waveguides, direct-current breaks, power monitors, mitre bends, polarizers, switches, loads, and pumping sections and will have a typical length that ranges from 100 to 160 m. Overall transmission efficiency could be as high as 92% depending on the specific path between a given gyrotron and launcher. All components are required to be 2-MW compatible, and their layout and organization have been optimized for simplifying the maintenance accessibility and monitoring the primary tritium barrier integrity. Two different TL layouts are at the moment under study, to accommodate the two alternative options for the European sources: four 2-MW units or eight 1-MW units. In this paper the actual design is presented and the technical requirements are discussed.
科研通智能强力驱动
Strongly Powered by AbleSci AI