可靠性
质量(理念)
控制(管理)
边距(机器学习)
业务
环境经济学
计算机科学
经济
管理
政治学
认识论
机器学习
哲学
法学
作者
Xiangtian Nie,Yuhao Wang,Wang Bo
出处
期刊:Journal of Coastal Research
[BioOne (Coastal Education and Research Foundation)]
日期:2020-10-05
卷期号:104 (sp1)
被引量:5
标识
DOI:10.2112/jcr-si104-074.1
摘要
Nie, X.T.; Wang, Y.H., and Wang, B., 2020. Quality control of water conservancy construction projects considering contractor's credibility. In: Guido Aldana, P.A. and Kantamaneni, K. (eds.), Advances in Water Resources, Coastal Management, and Marine Science Technology. Journal of Coastal Research, Special Issue No. 104, pp. 410–414. Coconut Creek (Florida), ISSN 0749-0208.This paper studies the decision-making on quality supervision and the issue of retaining quality margin of the owner in different situations of available information within a construction supply chain composed of both the owner and the contractor of water conservancy projects. Based on the influence of the credibility level of the contractor in varying situations of information availability and by drawing from the principle of maximum value as well as the game theory, we have analyzed the relationship among the level of quality supervision, the amount of retained quality margin, and the quality credibility level with different information. Through our analysis, we aim to help owners avoid moral hazards by contractors as well as the latent risks and potential losses. The study helps to improve the quality supervision by owners and achieve the win-win outcomes for both owners and contractors.
科研通智能强力驱动
Strongly Powered by AbleSci AI