禁忌搜索
数学优化
作业车间调度
调度(生产过程)
计算机科学
计算
整数规划
分界
柔性制造系统
算法
数学
地铁列车时刻表
操作系统
作者
Yan Zheng,Yujie Xiao,Yoonho Seo
标识
DOI:10.1080/00207543.2014.910628
摘要
Machines and automated guided vehicles (AGVs) scheduling problems are two essential issues that need to be addressed for the efficiency of the overall production system. The purpose of this paper is to study the simultaneous scheduling problem of machines and AGVs in a flexible manufacturing system (FMS) since the global optimum cannot be reached by considering each of them individually. In this paper, a mixed integer linear programming (MILP) model is developed with the objective of makespan minimisation. The MILP model consists of the following two constraint sets: machines and AGVs scheduling sub-problems. As both sub-problems are known to be NP-hard, a heuristic algorithm based on tabu search (TS) is proposed to get optimal or near to optimal solution for large-size problems within reasonable computation time. The proposed algorithm includes a novel two-dimensional solution representation and the generation of two neighbour solutions, which are alternately and iteratively applied to improve solutions. Moreover, an improved lower bound calculation method is introduced for the large-size problems. Computational results show the superior performance of the TS algorithm for the simultaneous scheduling problem.
科研通智能强力驱动
Strongly Powered by AbleSci AI